At Robbie Lee Developments Pty Ltd, we are well known for our attention to detail. Whether it's a residential, commercial or industrial project, all works will be completed to the highest standards possible. With our knowledge and experience in Asbestos Removal, Demolition and Site Remediation, you can rely on us when it comes to the Quality, Safety & success your next project. See below for examples of some of our past projects.

Past Projects

Andrew Street, Bowenfels
Project Profile:

Location: 16 Andrew Street, Bowenfels - NSW

Client: Joss Group Pty Ltd

Project Value: $38,000

Category: Friable Asbestos Removal & Demolition

Duration of Project: 4 days

Equipment Used: 26t Excavator, 5t Excavator, 20m3 Skip Bins, Bogie tipper trucks.

Summary of Project:

RLD was contracted by Joss Facilities Maintenance to undertake friable asbestos removal and demolition works to a residential property that was severely impacted by fire. 

The burnt-out building was sprayed with a PVA solution to encapsulate fibres. The building was then mechanically demolished with our 26t excavator. Water spray was used to suppress dust whilst the building was being demolished and the waste was being loaded into the 200um thick plastic lined skip bins where it was disposed of as asbestos waste at Lithgow Waste Facility. Following the demolition of the structure, a 200mm soil scrape was undertaken and the soil was disposed of as asbestos waste.
RLD arranged licenced Asbestos Assessor to undertake Air-Monitoring for the duration of the asbestos removal works and to conduct a Clearance inspection and air-monitoring upon completion and issue a Clearance Certificate. The area was levelled with clean imported fill following the Clearance inspection.

Kurim Ave, Orange:
Project Profile

Location: Orange - NSW

Client: RCC National Pty Ltd on behalf of Youi Insurance

Project Value: $50,000

Category: Friable Asbestos Removal & Demolition

Duration of Project: 5 days

Equipment Used: 26t Excavator, Semi Tipper Trucks

Summary of Project:

RLD were engaged to undertake the demolition of a fire damaged friable asbestos containing residential property. RLD organised an emergency order with Orange City Council to undertake the demolition of the property. RLD also arranged the disconnection of services on behalf of the client.
The RLD team sprayed the burnt-out building with a PVA solution to encapsulate fibres. The building was then mechanically demolished with our 26t excavator. Water spray was used to suppress dust whilst the building was being demolished and the waste was being loaded into the 200um thick plastic lined semi-tipper trucks and 200um thick plastic lined 20m3 skip bins. The waste was disposed of at Orange City Council waste facility.
During the demolition works additional asbestos sheeting was found to be attached to the underside of some of the concrete slabs. The contaminated concrete was disposed of as asbestos waste.
A 200mm soil scrape was undertaken and disposed of as asbestos waste.
A licenced Asbestos Assessor conducted Air-Monitoring for the duration of the asbestos removal works and conducted a Clearance inspection and air-monitoring upon completion and issued a Clearance Certificate.
The site was left level and clean.

Quandialla:
Project Profile

Location: Quandialla Public School – NSW

Client: Joss Group Pty Ltd

Value of Project: $75,000

Category: Friable Asbestos Removal & Demolition

Duration of Project: 5 days

Equipment Used: 26t Excavator, Water Cart, Semi Tipper trucks

Summary of Project:

RLD was engaged by Joss Facilities Maintenance to undertake a complete demolition of the C Block building at Quandialla Public School. The building which contained asbestos, was significantly damaged by a fire. 

A licenced Asbestos Assessor undertook Air-Monitoring for the duration of the asbestos removal works and conducted a Clearance inspection and air-monitoring upon completion and issued a Clearance Certificate. 

The burnt-out building was sprayed with a PVA solution to encapsulate fibres. The building was then mechanically demolished with our 26t excavator. We Used a water cart to supply adequate water pressure and supply; water spray was used to suppress dust whilst the building was being demolished and the waste was being loaded into the 200um thick plastic lined semi-tipper trucks where it was disposed of as asbestos waste. A total of 9 loads were taken to the licenced waste facility at Bland Shire Council. Geofabric was used to prevent cross-contamination. A 200mm soil scrape was undertaken and disposed of as asbestos waste. The area was levelled with clean imported fill following the Clearance inspection.
Robbie Lee Developments Pty Ltd are well recognised for attention to detail.